
Toyota Motor Manufacturing 830 Planning Schedule with Release Capability
Toyota Motor Manufacturing · X12 004010
The Toyota Motor Manufacturing 830 is the planning schedule a customer sends to forecast the quantities it expects to order.
Toyota Motor Manufacturing’s published 830 specification, rendered as an interactive guide. Expand any segment to see its elements, data types, lengths and accepted codes — then validate your own document against it below.
Specification
16 of 16 segments
HEADING
ST
Transaction Set Header ST
pos 010
Optional
max —
BFR
Beginning Segment For Planning Schedule BFR
pos 020
Required
max —
N1 LoopN1 Loop Contracted Service Providervariant 1 of 2required
N1
Name N1
pos 230
Required
max —
N1 LoopN1 Loop Foreign Suppliervariant 2 of 2required
N1
Name N1
pos 235
Required
max —
DETAIL
LIN Looprequired
LIN
Item Identification LIN
pos 010
Required
max —
UIT
Unit Detail UIT
pos 020
Required
max —
PID
Product Item Description PID
pos 080
Required
max 1000
PO4
Item Physical Details PO4
pos 120
Required
max —
PRS
Part Release Status PRS
pos 130
Required
max —
REF
Reference Identification REF
pos 140
Required
max 12
PER
Administrative Communications Contact PER
pos 150
Required
max 3
TD5
Carrier Details Routing Sequence Transit Time TD5
pos 250
Required
max 12
SDP Looprequired
SDP
Ship Delivery Pattern SDP
pos 450
Required
max —
FST
Forecast Schedule FST
pos 460
Required
max 260
SUMMARY
CTT
Transaction Totals CTT
pos 010
Required
max —
SE
Transaction Set Trailer SE
pos 020
Optional
max —
Validate your 830
Paste or upload a document and check it against Toyota Motor Manufacturing’s published rules — segment order and repetition, required elements, field lengths, data types and accepted codes. Nothing is stored.
Go live on Toyota Motor Manufacturing’s 830 in days, not months
Connect this guide to your accounting system and test with Toyota Motor Manufacturing yourself, or leave the mapping and the test cycle to us, at no extra charge.