Northern Tool and Equipment 860 Purchase Order Change Request - Buyer Initiated
Northern Tool and Equipment · X12 004010
The Northern Tool and Equipment 860 is the purchase order change a customer sends to modify an order it already placed.
Northern Tool and Equipment’s published 860 specification, rendered as an interactive guide. Expand any segment to see its elements, data types, lengths and accepted codes — then validate your own document against it below.
Specification
29 of 29 segments
HEADING
ST
Transaction Set Header ST
pos 010
Optional
max —
BCH
Beginning Segment For Purchase Order Change BCH
pos 020
Required
max —
REF
Reference Identification REF
pos 050
Required
max —
PER
Administrative Communications Contact PER
pos 060
Optional
max 3
FOB
Fob Related Instructions FOB
pos 080
Optional
max —
CSH
Sales Requirements CSH
pos 110
Optional
max 5
SAC Loop
SAC
Service Promotion Allowance Or Charge Information SAC
pos 120
Required
max —
ITD
Terms Of Sale Deferred Terms Of Sale ITD
pos 130
Optional
max 5
DTM
Date Time Reference DTM
If line level dates are not provided, a header level date will always be sent.
If both line level and header level dates are provided, the line level date takes precedence.
pos 150
Optional
max 10
TD5
Carrier Details Routing Sequence Transit Time TD5
pos 240
Optional
max 12
N9 Loop
N9
Reference Identification N9
pos 285
Required
max —
MSG
Message Text MSG
pos 290
Optional
max 1000
N1 Loop
N1
Name N1
pos 300
Required
max —
N2
Additional Name Information N2
pos 310
Optional
max 2
N3
Address Information N3
pos 320
Required
max 2
N4
Geographic Location N4
pos 330
Required
max —
PER
Administrative Communications Contact PER
pos 350
Optional
max —
DETAIL
POC Loop
POC
Line Item Change POC
If the item sent contains a quantity change, the actual change will be the difference between the value in POC03 and POC04.
pos 010
Required
max —
PID Loop
PID
Product Item Description PID
pos 050
Required
max —
PO4
Item Physical Details PO4
pos 090
Optional
max —
SDQ
Destination Quantity SDQ
This segment will only be sent for changes to the store allocation for Cross Dock orders shipping to the Northern Tool Warehouse.
pos 190
Optional
max 500
DTM
Date/Time Reference Delivery Requestedvariant 1 of 3
If header level dates are not provided, a line level date will always be sent.
If both line level and header level dates are provided, the line level date takes precedence.
pos 200
Optional
max 10
DTM
Date/Time Reference Requested Pick-upvariant 2 of 3
If header level dates are not provided, a line level date will always be sent.
If both line level and header level dates are provided, the line level date takes precedence.
pos 200
Optional
max —
DTM
Date/Time Reference Requested Shipvariant 3 of 3
If header level dates are not provided, a line level date will always be sent.
If both line level and header level dates are provided, the line level date takes precedence.
pos 200
Optional
max —
MSG
Message Text MSG
pos 292
Optional
max —
AMT Looprequired
AMT
Monetary Amount AMT
pos 590
Required
max —
SUMMARY
CTT Looprequired
CTT
Transaction Totals CTT
pos 010
Required
max —
AMT
Monetary Amount AMT
pos 020
Required
max 5
SE
Transaction Set Trailer SE
pos 030
Optional
max —
Validate your 860
Paste or upload a document and check it against Northern Tool and Equipment’s published rules — segment order and repetition, required elements, field lengths, data types and accepted codes. Nothing is stored.
Go live on Northern Tool and Equipment’s 860 in days, not months
Connect this guide to your accounting system and test with Northern Tool and Equipment yourself, or leave the mapping and the test cycle to us, at no extra charge.