The Boeing 865 is the purchase order change acknowledgment a supplier sends in reply to an 860.
Boeing’s published 865 specification, rendered as an interactive guide. Expand any segment to see its elements, data types, lengths and accepted codes — then validate your own document against it below.
Specification
8 of 8 segments
HEADING
ST
Transaction Set Header ST
pos 010
Optional
max —
BCA
Beginning Segment For Purchase Order Change Acknowledgment BCA
pos 020
Required
max —
DETAIL
POC Loop
POC
Line Item Change POC
To specify changes to a line item and should only be included when BAK02 is “AC”.
pos 010
Required
max —
CTP
Pricing Information CTP
CTP should only be used when BAK02 is "AC" and must be used to convey any price changes.
• The CTP segment is used in conjunction with an ACK01 segment "Line Item Status Code" (IP) for Price Change.
pos 040
Optional
max —
ACK Loop
ACK
Line Item Acknowledgment ACK
ACK should only be used when the Acknowledgment Type (BAK02) is assigned a value of 'AC' and it should only be used for the following reasons.
* Date Reschedule
* Price Changed
* Quantity Changed
* Item Rejection
pos 270
Required
max —
SCH Loop
SCH
Line Item Schedule SCH
SCH is used to display original Schedule Dates on the original Purchase Order (850).
pos 305
Required
max —
SUMMARY
CTT Loop
CTT
Transaction Totals CTT
pos 010
Required
max —
SE
Transaction Set Trailer SE
pos 030
Optional
max —
Validate your 865
Paste or upload a document and check it against Boeing’s published rules — segment order and repetition, required elements, field lengths, data types and accepted codes. Nothing is stored.
Go live on Boeing’s 865 in days, not months